Terre Haute Lost Creek Lift Station Project

Terre Haute Lost Creek Lift Station Project

Terre Haute Lost Creek Lift Station Project

Client

City of Terre Haute

Follow Us On

Project Description: The project included construction of a 22 MGD sanitary lift station and approximately 320 feet of 30-inch force main to replace the existing lift station on the same site. The new lift station featured a cast-in-place concrete screen channel, wet-well, valve vault, masonry building, submersible pumps with VFD controls, dual channel mechanical screen equipment, equipment hoist, diesel generator, site lighting, and various site improvements. The project also included stream bank and channel stabilization along the perimeter of the site and demolition of the existing lift station to allow space for additional site improvements.

Approximate Construction Cost: $5,500,000

Breadth of Services Provided: Survey, Land Acquisition, Design Engineering, Permitting, Construction Administration

image-93

Lost Creek Lift Station

Lost Creek Lift Station

Lost Creek Lift Station

Client

City of Terre Haute, Indiana

Follow Us On

Project Description:  The City’s existing lift station that conveyed wastewater for a large portion of the north side of Terre Haute was beyond its design life and in need of replacement.

United Consulting designed the new facility with a design capacity of 20 million gallons per day including a new, cast-in-place concrete structure, masonry building, submersible pumps with VFD controls, dual mechanical screen equipment, and other necessary improvements.

Approximate Project Cost:  $5,500,000

Breadth of Services Provided:  Survey, Land Acquisition, Design Engineering, Permitting, and Construction Administration

SANYO DIGITAL CAMERA

Kokomo W. Sycamore Street Lift Station and Sewer Extension Project

Kokomo W. Sycamore Street Lift Station and Sewer Extension Project

Kokomo W. Sycamore Street Lift Station and Sewer Extension Project

Client

City of Kokomo, Indiana

Follow Us On

Project Description:  Extension of sanitary sewer service westward from the City including a new regional lift station, 2100 feet of forcemain, and approximately 4,700 feet of new, deep sanitary sewer.

Approximate Project Cost:  $800,000

Breadth of Services Provided:  Survey, Planning, Design, and Construction Administration

SANYO DIGITAL CAMERA

Wabash NE Sewer Separation Project

Wabash NE Sewer Separation Project

Wabash NE Sewer Separation Project

Client

City of Wabash, Indiana

Follow Us On

Project Description:  The project included construction of approximately 10,000 feet of 12-inch to 30-inch storm sewer and approximately 1,500 feet of sanitary sewer for sewer separation and reduction of CSO volumes to Charley Creek. Approximately 2,000 feet of storm sewer was located within pavement of SR 13 and involved significant coordination with INDOT and utilities. United assisted the City in obtaining the IOCRA Grant and other financing for the project.

Approximate Project Cost:  $1,500,000

Breadth of Services Provided:  Planning, Survey, Design Engineering, Permitting, Land Acquisition, Bidding Services, and Construction Administration

image-317

City of Bicknell Wastewater Treatment Plant

City of Bicknell Wastewater Treatment Plant

City of Bicknell Wastewater Treatment Plant

Client

City of Bicknell, Indiana

Follow Us On

Project Description:  Historically, the City had experienced problems with Inflow/Infiltration (I/I) in its system and its treatment plant was in need of rehabilitation or replacement.  The City contracted with United Consulting to review the 3-year-old studies, further investigate the system and update any applicable data.  United Consulting prepared the City’s Wastewater Compliance Plan required by the State of Indiana. Also, United Consulting prepared a Preliminary Engineering Report (PER) for an SRF loan to construct a new 1.0 MGD wastewater treatment plant.  The plant includes a new Laboratory and Office Building, headworks with fine screening and pump equipment, oxidation ditch, secondary clarifiers, uv disinfection, aerobic digestion, and geotextile bag dewatering facilities.

Approximate Project Cost:  $5,000,000

Breadth of Services Provided:  Survey, Planning, Preliminary Engineering, Design Engineering, and Construction Administration

image-310

City of Sullivan Wastewater Treatment Plant

City of Sullivan Wastewater Treatment Plant

City of Sullivan Wastewater Treatment Plant

Client

City of Sullivan, Indiana

Follow Us On

Project Description:  The City of Sullivan found itself involved with Enforcement Action with the Indiana Department of Environmental Management (IDEM). The existing Lagoon Wastewater Treatment Plant could not comply with its upcoming NPDES Limits.  United Consulting evaluated the existing facility and prepared the required Water Quality Standards Compliance Plan for the City. A new mechanical wastewater treatment plant was proposed and the Preliminary Engineering Report required for the State Revolving Fund Loan Program was approved.  United Consulting also assisted the City in obtaining a $500,000 grant from the Indiana Office of Rural Affairs. The project is completed and operating within the City’s NPDES Permit Requirements.

Approximate Project Cost:  $5,500,000

Breadth of Services Provided:  Planning, Survey, Preliminary Engineering, Design Engineering, and Construction Administration

image-342

River Road Finish & Raw Watermain Extension

River Road Finish & Raw Watermain Extension

River Road Finish & Raw Watermain Extension

Client

Indianapolis Water Company, Indianapolis, Indiana

Follow Us On

Project Description:  In order to provide adequate water for the Town of North Harbour and other developing areas north of Indianapolis, the Indianapolis Water Company hired United Consulting to design a watersystem extension project.  The project included two parallel 36” diameter watermain approximately 3.5 miles long through a highly developed area of the City of Carmel.

Approximate Project Cost:  $5,000,000

Breadth of Services Provided:  Survey, Design Services, Easement Preparation, Land Acquisition, and Construction Services

SANYO DIGITAL CAMERA

Wabash CSO LTCP Studies

Wabash CSO LTCP Studies

Wabash CSO LTCP Studies

Client

City of Wabash, Indiana

Follow Us On

Project Description:  United prepared the City’s CSO Operational Plan, Stream Reach Characterization Evaluation Report (SRCER) and CSO Long Term Control Plan (LTCP). United Consulting also serves as the City’s MS4 review authority and has provided Stormwater Master Planning for the Stormwater Utility.

Approximate Project Cost:  $13,000,000

Breadth of Services Provided:  IDEM Coordination and evaluation, coordination with City personnel, report preparation, SRCER Protocol Establishment, MS4 Studies and Evaluations, CAC Meetings, Test Data Evaluation, Establishing and Evaluating Projects Scope and Costs, Alternative Evaluation, XPSWMM Hydraulic Analysis and Modeling, Public Meetings and Presentations, Use Attainability Analysis, Affordability Analysis, and Preliminary Engineering

image-328

Hartford City 2010 Sewer Separation

Hartford City 2010 Sewer Separation

Hartford City 2010 Sewer Separation

Client

City of Hartford City, Indiana

Follow Us On

Project Description:  The City of Hartford City began early action projects to reduce CSO overflows and to comply with its CSO Long Term Control Plan. The project included approximately 5,800 feet storm sewer installation to separate clear water sources from the combination sewer system. OCRA grant funds financed a portion of the project.

Approximate Project Cost:  $750,000

Breadth of Services Provided:  Planning, Survey, Funding Assistance, Design, System Modeling, Construction Administration, and Land Acquisition

SANYO DIGITAL CAMERA

Indianapolis Castleton Relief Sewer Project

Indianapolis Castleton Relief Sewer Project

Indianapolis Castleton Relief Sewer Project

Client

City of Indianapolis, Department of Public Works

Follow Us On

Project Description:  The project involves approximately 13,800 feet of new 36-inch and 42-inch relief sewer to provide additional capacity for current wet-weather flows and future development in the Castleton area on the northeast side of Indianapolis. Approximately 2,800 feet of the proposed sewer was installed in areas of high groundwater and difficult soil conditions by the microtunneling method.

Approximate Project Cost:  $13,500,000

Breadth of Services Provided:  Planning, Survey, Environmental Services, Design Engineering, Permitting, Public Meetings, Land Acquisition, Bidding Services, and Construction Assistance