The project included construction of a 22 MGD sanitary lift station and approximately 320 feet of 30-inch force main to replace the existing lift station on the same site.
Lost Creek Lift Station
The City’s existing lift station that conveyed wastewater for a large portion of the north side of Terre Haute was beyond its design life and in need of replacement.
Kokomo W. Sycamore Street Lift Station and Sewer Extension Project
Extension of sanitary sewer service westward from the City including a new regional lift station, 2100 feet of forcemain, and approximately 4,700 feet of new, deep sanitary sewer.
Wabash NE Sewer Separation Project
The project included construction of approximately 10,000 feet of 12-inch to 30-inch storm sewer and approximately 1,500 feet of sanitary sewer for sewer separation and reduction of CSO volumes to Charley Creek.
City of Bicknell Wastewater Treatment Plant
Historically, the City had experienced problems with Inflow/Infiltration (I/I) in its system and its treatment plant was in need of rehabilitation or replacement.
City of Sullivan Wastewater Treatment Plant
The City of Sullivan found itself involved with Enforcement Action with the Indiana Department of Environmental Management (IDEM).
River Road Finish & Raw Watermain Extension
In order to provide adequate water for the Town of North Harbour and other developing areas north of Indianapolis, the Indianapolis Water Company hired United Consulting to design a watersystem extension project.
Wabash CSO LTCP Studies
United prepared the City’s CSO Operational Plan, Stream Reach Characterization Evaluation Report (SRCER) and CSO Long Term Control Plan (LTCP). United Consulting also serves as the City’s MS4 review authority and has provided Stormwater Master Planning for the Stormwater Utility.
Hartford City 2010 Sewer Separation
The City of Hartford City began early action projects to reduce CSO overflows and to comply with its CSO Long Term Control Plan.
Indianapolis Castleton Relief Sewer Project
The project involves approximately 13,800 feet of new 36-inch and 42-inch relief sewer to provide additional capacity for current wet-weather flows and future development in the Castleton area on the northeast side of Indianapolis.