The project included pumping and screening upgrades at a headworks facility with hydraulic capacity of 30 MGD.
Hartford City Commissioners Drain Project
Project included complete separation of the sanitary/storm systems, new sanitary sewers and storm sewers. A CSO was eliminated from the system by this project.
Evansville Eastview Terrace
The project includes approximately 6,500 feet of 48-inch to 96-inch storm sewer to address flooding issues in the Eastview Terrace neighborhood and 3,800 LF of water main relocation.
Cicero Ultraviolet Disinfectant System Replacement
The ultraviolet (UV) disinfection equipment that was installed 26 years earlier at Cicero’s Wastewater Treatment Plant had become outdated and inefficient.
New Albany Raw Wastewater Lift and Dump Station
The New Albany Wastewater Plant had needs at its headworks (raw wastewater pumping station) for a collection system cleaning equipment dump station.
New Castle CSO Mitigation Project 8B
The second phase of New Castle’s CSO Long-Term Control Plan (LTCP) included new sanitary and storm sewer projects in a central portion of the city.
New Castle CSO Mitigation Project 3B
The first phase of New Castle’s CSO Long-Term Control Plan (LTCP) included a large sewer separation project that included the placement of approximately 14,000 feet of new storm sewer (ranging from 12 to 60 inches in diameter) with 2,000 feet of new sanitary sewer.
Cicero Hidden Bay Water Main Improvement
Cicero had a failing water system in the Hidden Bay neighborhood. The system was old and leaking and in some cases installed below or immediately adjacent to resident’s homes.
New Castle Industrial Park Lift Station
Upgrades to the existing lift station and extensions to the gravity sewer were needed at New Castle’s Industrial Park in order to provide sanitary sewer services for a new industry.
US 41 Stormwater Pump Station Project
The project included construction of a 39 MGD stormwater pump station and approximately 700 feet of 48-inch force main.