City of Wabash Headworks Project

City of Wabash Headworks Project

City of Wabash Headworks Project

Client

City of Wabash

Follow Us On

Project Description: The project included pumping and screening upgrades at a headworks facility with hydraulic capacity of 30 MGD. The existing headworks structure was reconfigured following the removal of two screw pumps with the addition of parallel fine mechanical screens, dual washer compactors, four submersible pumps with variable frequency drives (VFDs) and automated controls, slide gates, a trolley hoist assembly, and headworks screening building. Floatables and debris entering the plant were reduced, as well as improved reliability, control, and monitoring of pumping operations. The original/overall design was also provided by United staff in the 1990s.

Approximate Construction Cost: $2,100,000

Breadth of Services Provided: Design Engineering, Bid Assistance, Construction Administration

image-188

Hartford City Commissioners Drain Project

Hartford City Commissioners Drain Project

Hartford City Commissioners Drain Project

Client

City of Hartford City, Indiana

Follow Us On

Project Description:  Project included complete separation of the sanitary/storm systems, new sanitary sewers and storm sewers.  A CSO was eliminated from the system by this project.

Approximate Project Cost:  $1,400,000

Breadth of Services Provided:  Survey, Design Engineering, Permitting, and Construction Inspection

image-183

Evansville Eastview Terrace

Evansville Eastview Terrace

Evansville Eastview Terrace

Client

City of Evansville, Indiana

Follow Us On

Project Description:  The project includes approximately 6,500 feet of 48-inch to 96-inch storm sewer to address flooding issues in the Eastview Terrace neighborhood and 3,800 LF of water main relocation.  The proposed storm sewer will discharge to the existing K-3 Lift Station ponding area and includes coordination and permitting with the U.S. Army Corps of Engineers.  The project design included development of a SWMM model used to size the proposed storm sewer and evaluate the operation of the proposed system under various design storms.

Approximate Project Cost:  $5,600,000

Breadth of Services Provided:  Study & Evaluation, Survey, Design Engineering, Water Main Relocation, Permitting, Bid Assistance, and Construction Inspection

image-176

Cicero Ultraviolet Disinfectant System Replacement

Cicero Ultraviolet Disinfectant System Replacement

Cicero Ultraviolet Disinfectant System Replacement

Client

Town of Cicero

Follow Us On

Project Description: The ultraviolet (UV) disinfection equipment that was installed 26 years earlier at Cicero’s Wastewater Treatment Plant had become outdated and inefficient. Repairing the equipment became problematic due to service issues and difficulty obtaining replacement parts. United Consulting evaluated new UV system options and designed improvements to modernize the facility and provide proper disinfection.

Approximate Project Cost: $400,000

Breadth of Services Provided: Equipment Evaluation, Design Engineering, Bid Assistance, Construction Administration / Periodic Inspection

Approximate Project Cost: $1,600,000

Breadth of Services Provided: Equipment Evaluation, Design Engineering, Bid Assistance, Construction Administration / Periodic Inspections

image-168

New Albany Raw Wastewater Lift and Dump Station

New Albany Raw Wastewater Lift and Dump Station

New Albany Raw Wastewater Lift and Dump Station

Client

City of New Albany

Follow Us On

Project Description: The New Albany Wastewater Plant had needs at its headworks (raw wastewater pumping station) for a collection system cleaning equipment dump station. The raw pump station required valve replacement, piping modifications, and painting of the dry pit piping system. Another portion of the raw pumping system improvements included the addition of a third submersive pump, VFD, controls, and appurtenances. The Truck Dump Station portion of the project included new facilities for interior truck dumping and mechanical screening equipment to remove debris from the influent plant flow. New structures and a building were included in the project.

Approximate Project Cost: $1,600,000

Breadth of Services Provided: Equipment Evaluation, Design Engineering, Bid Assistance, Construction Administration / Periodic Inspections

image-163

New Castle CSO Mitigation Project 8B

New Castle CSO Mitigation Project 8B

New Castle CSO Mitigation Project 8B

Client

City of New Castle

Follow Us On

Project Description: The second phase of New Castle’s CSO Long-Term Control Plan (LTCP) included new sanitary and storm sewer projects in a central portion of the city. The project included placing approximately 6,400 feet of new storm sewer (ranging from 12 to 36 inches in diameter) and 1,000 feet of new sanitary sewer. The project dramatically improved storm drainage for the community and mitigated the impact of the CSOs. Roadway, sidewalk, and ADA improvements were also made as part of the project.

Approximate Project Cost: $2,800,000

Breadth of Services Provided: CSO LTCP Preparation, Financing Assistance, Design Engineering, Land Acquisition Assistance, Bid Assistance, Construction Administration/Periodic Inspection, Post-Construction Monitoring

image-155

New Castle CSO Mitigation Project 3B

New Castle CSO Mitigation Project 3B

New Castle CSO Mitigation Project 3B

Client

City of New Castle

Follow Us On

Project Description: The first phase of New Castle’s CSO Long-Term Control Plan (LTCP) included a large sewer separation project that included the placement of approximately 14,000 feet of new storm sewer (ranging from 12 to 60 inches in diameter) with 2,000 feet of new sanitary sewer.  The project dramatically improved storm drainage for the community and mitigated the impact of the CSOs.  Roadway, sidewalk, and ADA improvements were also made as part of the project.

Approximate Project Cost: $7,000,000

Breadth of Services Provided: CSO LTCP Preparation, Financing Assistance, Design Engineering, Land Acquisition Assistance, Bid Assistance, Construction Administration/Periodic Inspection, Post-Construction Monitoring

image-150

Cicero Hidden Bay Water Main Improvement

Cicero Hidden Bay Water Main Improvement

Cicero Hidden Bay Water Main Improvement

Client

Town of Cicero

Follow Us On

Project Description: Cicero had a failing water system in the Hidden Bay neighborhood. The system was old and leaking and in some cases installed below or immediately adjacent to resident’s homes. As the watermain experienced breaks, town personnel performed hand excavations to complete repairs, which resulted in unsafe conditions for workers and residents. United assisted the town with the OCRA grant pursuit. After successfully receiving the grant, United designed improvements to replace approximately 2,400 feet of watermain with appurtenances, which relocated the system to the road right-of-way where it could be safely maintained.

Approximate Project Cost: $600,000

Breadth of Services Provided: Grant / Financing Assistance, Design Engineering, Bid Assistance, Construction Administration/Periodic Inspection

image-140

New Castle Industrial Park Lift Station

New Castle Industrial Park Lift Station

New Castle Industrial Park Lift Station

Client

City of New Castle

Follow Us On

Project Description: Upgrades to the existing lift station and extensions to the gravity sewer were needed at New Castle’s Industrial Park in order to provide sanitary sewer services for a new industry. The project also included the placement of approximately 2,500 feet of new (12-inch diameter) sanitary sewer. The project had an accelerated completion schedule to meet the industry’s opening date.

Approximate Project Cost: $200,000

Breadth of Services Provided: System Capacity Evaluation / Option Development, Design Engineering, Bid Assistance, Construction Administration / Periodic Inspections

image-129

US 41 Stormwater Pump Station Project

US 41 Stormwater Pump Station Project

US 41 Stormwater Pump Station Project

Client

Indiana Department of Transportation

Follow Us On

Project Description: The project included construction of a 39 MGD stormwater pump station and approximately 700 feet of 48-inch force main. The pump station included a new cast-in-place concrete structure, masonry control building, submersible pumps with VFD controls, screen structure, influent gate controls, and cast-in-place gatewell/energy dissipation structure at the levee force main discharge location as permitted by the USACE.

Approximate Construction Cost: $3,600,000

Breadth of Services Provided: Survey, Planning, Design Engineering, Permitting, Land Acquisition, Construction Assistance