United Consulting knows how precious our water resources are, which is why we pride ourselves in planning, designing, and creating effective, efficient systems to manage human water resources. Our team of civil engineers and technical support staff assess the best ways to collect, treat, and transport – such as treatment, filtration, distribution, collection, waste disposal, overflow protection, and more.
Whether it is designing an entirely new system, or upgrading one that is currently in place, our team is able to manage your project on-time and on-budget.
Water Resource Services
- Water Treatment Plant & Distribution System Studies
- Regulatory Agency Requirement Evaluation & Negotiation
- Raw Water Source Development Studies & Design
- Distribution System Mapping & Modeling
- Water Treatment Plant Design
- Water Distribution System Design
- Developer Submittal Review
- Construction Administrator
- Drainage Studies & Evaluations
- Drainage System Design
- Drainage System Modeling & Mapping
- MS4 Studies, Review, Reporting, & Program Management
- Stormwater Master Planning
- Channel Stabilization Evaluation & Design
- Developer Submittal Review
- Construction Administration
- Wastewater Treatment Plant & Collection System Studies
- NPDES Permit Evaluation & Regulatory Agency Negotiation
- Regulatory Agency Enforcement Action Evaluation & Negotiation
- Combined Sewer Overflow (CSO) Studies, Modeling, & Design
- Collection System Mapping & Modeling
- Wastewater Treatment Plant Design
- Collection System Design
- Construction Administration
Water Resource Projects

Greensbranch Combination Sewer Rehabilitation
In response to the requirement to reduce combined sewer overflows to the White River and increase the structural integrity of old brick sewers, the city of Anderson installed a cured-in-place pipe (CIPP) liner.

City of Wabash Headworks Project
The project included pumping and screening upgrades at a headworks facility with hydraulic capacity of 30 MGD.

Lost Creek Lift Station
The City’s existing lift station that conveyed wastewater for a large portion of the north side of Terre Haute was beyond its design life and in need of replacement.

Terre Haute Lost Creek Lift Station Project
The project included construction of a 22 MGD sanitary lift station and approximately 320 feet of 30-inch force main to replace the existing lift station on the same site.

US 41 Stormwater Pump Station Project
The project included construction of a 39 MGD stormwater pump station and approximately 700 feet of 48-inch force main. The pump station included a new cast-in-place concrete structure and masonry control building.

New Castle Industrial Park Lift Station
Upgrades to the existing lift station and extensions to the gravity sewer were needed at New Castle’s Industrial Park in order to provide sanitary sewer services for a new industry.

Cicero Hidden Bay Water Main Improvement
Cicero had a failing water system in the Hidden Bay neighborhood. The system was old and leaking and in some cases installed below or immediately adjacent to resident’s homes.

New Castle CSO Mitigation Project 3B
The first phase of New Castle’s CSO Long-Term Control Plan (LTCP) included a large sewer separation project that included the placement of approximately 14,000 feet of new storm sewer with 2,000 feet of new sanitary sewer.

New Castle CSO Mitigation Project 8B
The second phase of New Castle’s CSO Long-Term Control Plan (LTCP) included new sanitary and storm sewer projects in a central portion of the city.

New Albany Raw Wastewater Lift and Dump Station
The New Albany Wastewater Plant had needs at its headworks for a collection system cleaning equipment dump station.

Cicero Ultraviolet Disinfectant System Replacement
The ultraviolet (UV) disinfection equipment that was installed 26 years earlier at Cicero’s Wastewater Treatment Plant had become outdated and inefficient.

Evansville Eastview Terrace
The first phase of New Castle’s CSO Long-Term Control Plan (LTCP) included a large sewer separation project that included the placement of approximately 14,000 feet of new storm sewer with 2,000 feet of new sanitary sewer.

Hartford City Commissioners Drain Project
The first phase of New Castle’s CSO Long-Term Control Plan (LTCP) included a large sewer separation project that included the placement of approximately 14,000 feet of new storm sewer with 2,000 feet of new sanitary sewer.

Wabash NE Sewer Separation Project
The first phase of New Castle’s CSO Long-Term Control Plan (LTCP) included a large sewer separation project that included the placement of approximately 14,000 feet of new storm sewer with 2,000 feet of new sanitary sewer.

Kokomo W. Sycamore Street Lift Station and Sewer Extension Project
The first phase of New Castle’s CSO Long-Term Control Plan (LTCP) included a large sewer separation project that included the placement of approximately 14,000 feet of new storm sewer with 2,000 feet of new sanitary sewer.

City of Sullivan Wastewater Treatment Plant
The first phase of New Castle’s CSO Long-Term Control Plan (LTCP) included a large sewer separation project that included the placement of approximately 14,000 feet of new storm sewer with 2,000 feet of new sanitary sewer.

City of Bicknell Wastewater Treatment Plant
The first phase of New Castle’s CSO Long-Term Control Plan (LTCP) included a large sewer separation project that included the placement of approximately 14,000 feet of new storm sewer with 2,000 feet of new sanitary sewer.

New Castle Wastewater Treatment Plant
The first phase of New Castle’s CSO Long-Term Control Plan (LTCP) included a large sewer separation project that included the placement of approximately 14,000 feet of new storm sewer with 2,000 feet of new sanitary sewer.