Project Description: The ultraviolet (UV) disinfection equipment that was installed 26 years earlier at Cicero’s Wastewater Treatment Plant had become outdated and inefficient. Repairing the equipment became problematic due to service issues and difficulty obtaining replacement parts. United Consulting evaluated new UV system options and designed improvements to modernize the facility and provide proper disinfection.
Approximate Project Cost: $400,000
Breadth of Services Provided: Equipment Evaluation, Design Engineering, Bid Assistance, Construction Administration / Periodic Inspection
Approximate Project Cost: $1,600,000
Breadth of Services Provided: Equipment Evaluation, Design Engineering, Bid Assistance, Construction Administration / Periodic Inspections