Project Description: The project included construction of a 39 MGD stormwater pump station and approximately 700 feet of 48-inch force main. The pump station included a new cast-in-place concrete structure, masonry control building, submersible pumps with VFD controls, screen structure, influent gate controls, and cast-in-place gatewell/energy dissipation structure at the levee force main discharge location as permitted by the USACE.
Approximate Construction Cost: $3,600,000
Breadth of Services Provided: Survey, Planning, Design Engineering, Permitting, Land Acquisition, Construction Assistance