Project Description: This project consists of replacement of a four to five-lane curbed, urban corridor with storm sewers within the City of Fort Wayne. The project is needed to provide an improved access corridor and includes replacement of pavement, curbs and gutters, sidewalks, storm sewers, and many utility relocations. The location control route survey and topographic survey was performed by United Consulting on this highly congested project corridor. Locations of underground utilities were vital and extensive research and documentation of existing rights-of-way throughout the project length was performed during the survey. Approximate Project Cost: $4,300,000 Breadth of Services Provided: Topographic Survey, Environmental Services, Roadway Design, and Right-of-Way Engineering