I-80/94 Borman Expressway Design/Build

I-80/94 Borman Expressway Design/Build

Client

Indiana Department of Transportation (INDOT), Lake County

Follow Us On

Project Description:  Design Build project for the reconstruction and widening of nine miles of I-80/94 (Borman Expressway) included:  Two complete interchange reconstructions; four partial interchange reconstructions; pavement replacement; added travel lanes; retaining walls; local road improvements; seven bridge replacements; signing; lighting; wetland mitigation; noise barrier analysis and abatement; and transportation management plan.

Approximate Project Cost:  $150,000,000

Breadth of Services Provided:  Roadway Design, Bridge Design, Signing Design, Contract Documents, Environmental Permits, Bid Support, Post Bid Plan Review, and Final As-Built Review