Project Description: Design Build project for the reconstruction and widening of nine miles of I-80/94 (Borman Expressway) included: Two complete interchange reconstructions; four partial interchange reconstructions; pavement replacement; added travel lanes; retaining walls; local road improvements; seven bridge replacements; signing; lighting; wetland mitigation; noise barrier analysis and abatement; and transportation management plan.
Approximate Project Cost: $150,000,000
Breadth of Services Provided: Roadway Design, Bridge Design, Signing Design, Contract Documents, Environmental Permits, Bid Support, Post Bid Plan Review, and Final As-Built Review