Project Description:  Historically, the City had experienced problems with Inflow/Infiltration (I/I) in its system and its treatment plant was in need of rehabilitation or replacement.  The City contracted with United Consulting to review the 3-year-old studies, further investigate the system and update any applicable data.  United Consulting prepared the City’s Wastewater Compliance Plan required by the State of Indiana. Also, United Consulting prepared a Preliminary Engineering Report (PER) for an SRF loan to construct a new 1.0 MGD wastewater treatment plant.  The plant includes a new Laboratory and Office Building, headworks with fine screening and pump equipment, oxidation ditch, secondary clarifiers, uv disinfection, aerobic digestion, and geotextile bag dewatering facilities.

Approximate Project Cost:  $5,000,000

Breadth of Services Provided:  Survey, Planning, Preliminary Engineering, Design Engineering, and Construction Administration

Shopping Basket