Wabash CSO LTCP Studies

Wabash CSO LTCP Studies

Client City of Wabash, Indiana

Follow Us

Project Description:  United prepared the City’s CSO Operational Plan, Stream Reach Characterization Evaluation Report (SRCER) and CSO Long Term Control Plan (LTCP). United Consulting also serves as the City’s MS4 review authority and has provided Stormwater Master Planning for the Stormwater Utility.

Approximate Project Cost:  $13,000,000

Breadth of Services Provided:  IDEM Coordination and evaluation, coordination with City personnel, report preparation, SRCER Protocol Establishment, MS4 Studies and Evaluations, CAC Meetings, Test Data Evaluation, Establishing and Evaluating Projects Scope and Costs, Alternative Evaluation, XPSWMM Hydraulic Analysis and Modeling, Public Meetings and Presentations, Use Attainability Analysis, Affordability Analysis, and Preliminary Engineering

Read More

River Road Finish & Raw Watermain Extension

River Road Finish & Raw Watermain Extension

Client Indianapolis Water
Company, Indianapolis,
Indiana

Follow Us

Project Description:  In order to provide adequate water for the Town of North Harbour and other developing areas north of Indianapolis, the Indianapolis Water Company hired United Consulting to design a watersystem extension project.  The project included two parallel 36” diameter watermain approximately 3.5 miles long through a highly developed area of the City of Carmel.

Approximate Project Cost:  $5,000,000

Breadth of Services Provided:  Survey, Design Services, Easement Preparation, Land Acquisition, and Construction Services

Read More