Cicero Ultraviolet Disinfectant System Replacement

Cicero Ultraviolet Disinfectant System Replacement

Client Town of Cicero

Follow Us

Project Description: The ultraviolet (UV) disinfection equipment that was installed 26 years earlier at Cicero’s Wastewater Treatment Plant had become outdated and inefficient. Repairing the equipment became problematic due to service issues and difficulty obtaining replacement parts. United Consulting evaluated new UV system options and designed improvements to modernize the facility and provide proper disinfection.

Approximate Project Cost: $400,000

Breadth of Services Provided: Equipment Evaluation, Design Engineering, Bid Assistance, Construction Administration / Periodic Inspection

Read More

Evansville Eastview Terrace

Evansville Eastview Terrace

Client City of Evansville,
Indiana

Follow Us

Project Description:  The project includes approximately 6,500 feet of 48-inch to 96-inch storm sewer to address flooding issues in the Eastview Terrace neighborhood and 3,800 LF of water main relocation.  The proposed storm sewer will discharge to the existing K-3 Lift Station ponding area and includes coordination and permitting with the U.S. Army Corps of Engineers.  The project design included development of a SWMM model used to size the proposed storm sewer and evaluate the operation of the proposed system under various design storms.

Approximate Project Cost:  $5,600,000

Breadth of Services Provided:  Study & Evaluation, Survey, Design Engineering, Water Main Relocation, Permitting, Bid Assistance, and Construction Inspection

Read More

Hartford City Commissioners Drain Project

Hartford City Commissioners Drain Project

Client City of Hartford City,
Indiana

Follow Us

Project Description:  Project included complete separation of the sanitary/storm systems, new sanitary sewers and storm sewers.  A CSO was eliminated from the system by this project.

Approximate Project Cost:  $1,400,000

Breadth of Services Provided:  Survey, Design Engineering, Permitting, and Construction Inspection

Read More

Wabash NE Sewer Separation Project

Wabash NE Sewer Separation Project

Client City of Wabash, Indiana

Follow Us

Project Description:  The project included construction of approximately 10,000 feet of 12-inch to 30-inch storm sewer and approximately 1,500 feet of sanitary sewer for sewer separation and reduction of CSO volumes to Charley Creek. Approximately 2,000 feet of storm sewer was located within pavement of SR 13 and involved significant coordination with INDOT and utilities. United assisted the City in obtaining the IOCRA Grant and other financing for the project.

Approximate Project Cost:  $1,500,000

Breadth of Services Provided:  Planning, Survey, Design Engineering, Permitting, Land Acquisition, Bidding Services, and Construction Administration

Read More

Kokomo W. Sycamore Street Lift Station and Sewer Extension Project

Kokomo W. Sycamore Street Lift Station and Sewer Extension Project

Client City of Kokomo, Indiana

Follow Us

Project Description:  Extension of sanitary sewer service westward from the City including a new regional lift station, 2100 feet of forcemain, and approximately 4,700 feet of new, deep sanitary sewer.

Approximate Project Cost:  $800,000

Breadth of Services Provided:  Survey, Planning, Design, and Construction Administration

Read More

City of Sullivan Wastewater Treatment Plant

City of Sullivan Wastewater Treatment Plant

Client City of Sullivan, Indiana

Follow Us

Project Description:  The City of Sullivan found itself involved with Enforcement Action with the Indiana Department of Environmental Management (IDEM). The existing Lagoon Wastewater Treatment Plant could not comply with its upcoming NPDES Limits.  United Consulting evaluated the existing facility and prepared the required Water Quality Standards Compliance Plan for the City. A new mechanical wastewater treatment plant was proposed and the Preliminary Engineering Report required for the State Revolving Fund Loan Program was approved.  United Consulting also assisted the City in obtaining a $500,000 grant from the Indiana Office of Rural Affairs. The project is completed and operating within the City’s NPDES Permit Requirements.

Approximate Project Cost:  $5,500,000

Breadth of Services Provided:  Planning, Survey, Preliminary Engineering, Design Engineering, and Construction Administration

Read More

City of Bicknell Wastewater Treatment Plant

City of Bicknell Wastewater Treatment Plant

Client City of Bicknell, Indiana

Follow Us

Project Description:  Historically, the City had experienced problems with Inflow/Infiltration (I/I) in its system and its treatment plant was in need of rehabilitation or replacement.  The City contracted with United Consulting to review the 3-year-old studies, further investigate the system and update any applicable data.  United Consulting prepared the City’s Wastewater Compliance Plan required by the State of Indiana. Also, United Consulting prepared a Preliminary Engineering Report (PER) for an SRF loan to construct a new 1.0 MGD wastewater treatment plant.  The plant includes a new Laboratory and Office Building, headworks with fine screening and pump equipment, oxidation ditch, secondary clarifiers, uv disinfection, aerobic digestion, and geotextile bag dewatering facilities.

Approximate Project Cost:  $5,000,000

Breadth of Services Provided:  Survey, Planning, Preliminary Engineering, Design Engineering, and Construction Administration

Read More

New Castle Wastewater Treatment Plant

New Castle Wastewater Treatment Plant

Client City of New Castle

Follow Us

Project Description: 

2010 Project:  The project included various improvements to the 16 MGD Treatment Facility. The existing secondary 105’ diameter primary clarifiers and 120’ diameter clarifiers were evaluated and improvements made to correct hydraulic loading issues, the tertiary filters were rehabilitated and converted to monomedia high-rate filters and a new sodium hypochorite / sodium bisulfite disinfection system with new building was included. The improvements allow for the higher wet weather flow treatment included in the City’s approved CSO Long Term Control Plan also prepared by United Consulting.

Prior ProjectsUnited Consulting members also designed and managed prior projects at this facility over the last 15 years including: Equalization Basin Rehabilitation, Headworks Pumping and Screening Project, Biosolids Dewatering System Improvements, and other miscellaneous process improvements projects.

Approximate Project Cost:  $1,500,000

Breadth of Services Provided:  Planning, Preliminary Engineering, Survey, Design Engineering, Periodic Inspection, and Construction Administration

Read More

Indianapolis Castleton Relief Sewer Project

Indianapolis Castleton Relief Sewer Project

Client City of Indianapolis,
Department of Public
Works

Follow Us

Project Description:  The project involves approximately 13,800 feet of new 36-inch and 42-inch relief sewer to provide additional capacity for current wet-weather flows and future development in the Castleton area on the northeast side of Indianapolis. Approximately 2,800 feet of the proposed sewer was installed in areas of high groundwater and difficult soil conditions by the microtunneling method.

Approximate Project Cost:  $13,500,000

Breadth of Services Provided:  Planning, Survey, Environmental Services, Design Engineering, Permitting, Public Meetings, Land Acquisition, Bidding Services, and Construction Assistance

Read More

Hartford City 2010 Sewer Separation

Hartford City 2010 Sewer Separation

Client City of Hartford City,
Indiana

Follow Us

Project Description:  The City of Hartford City began early action projects to reduce CSO overflows and to comply with its CSO Long Term Control Plan. The project included approximately 5,800 feet storm sewer installation to separate clear water sources from the combination sewer system. OCRA grant funds financed a portion of the project.

Approximate Project Cost:  $750,000

Breadth of Services Provided:  Planning, Survey, Funding Assistance, Design, System Modeling, Construction Administration, and Land Acquisition

Read More