White River at Harding Street Siphon

Client:
City of Indianapolis Department of Public Works (DPW)

Project Description:

Phase I:  A Design/Build project to install a Sanitary Sewer below the White River.  The project included a large diameter siphon barrel below the White River as well as inlet and outlet structures and inter-connecting sewers.  This phase also included United States Army Corps of Engineers (USACE) levee excavation and reconstruction.

Phase II:  United Consulting also designed this phase of the project.  This phase included installation of the second barrel of the siphon below the White River as well as odor control facilities, building and site improvements.

Approximate Project Cost:

Phase I:  $1,700,000

Phase II:  $1,100,000 

Breadth of Services Provided:

Phase I:   Survey, Design Review, and Construction Inspection

Phase II:   Survey, Design Engineering, Permitting, and Construction Inspection